Iron & steel

CBAM default value for 7306 30 18

Precision tubes, welded, of circular cross-section, of iron or non-alloy steel (excl. cold-drawn or cold-rolled).

  • Other countries and territories: 4.090 tCO₂e/t, charged at 4.499 in 2026 and 5.317 from 2028
  • 32 countries have their own value, from 0.240 (Azerbaijan) to 8.230 (Indonesia)
Default values for CN 7306 30 18 by country, tCO₂e per tonne
CountryDirectIndirectTotalCharged 202620272028
Other countries and territories4.0900.0004.0904.4994.9085.317
Azerbaijan0.2400.0000.2400.2640.2880.312
Myanmar0.5600.0000.5600.6160.6720.728
Philippines0.8300.0000.8300.9130.9961.079
United States1.4000.0001.4001.5401.6801.820
Canada1.4400.0001.4401.5841.7281.872
Brazil1.6300.0001.6301.7931.9562.119
North Macedonia1.8980.0001.8982.0882.2782.467
Iran, Islamic Republic of1.9400.0001.9402.1342.3282.522
Thailand2.0300.0002.0302.2332.4362.639
Chile2.0500.0002.0502.2552.4602.665
Japan2.1000.0002.1002.3102.5202.730
Korea, Republic of (South Korea)2.1440.0002.1442.3582.5732.787
Türkiye2.2440.0002.2442.4682.6932.917
Bosnia and Herzegovina2.2900.0002.2902.5192.7482.977
Taiwan2.3130.0002.3132.5442.7763.007
Viet Nam2.3500.0002.3502.5852.8203.055
Ukraine2.3710.0002.3712.6082.8453.082
Serbia2.4100.0002.4102.6512.8923.133
New Zealand2.4200.0002.4202.6622.9043.146
United Kingdom2.4200.0002.4202.6622.9043.146
Colombia2.5600.0002.5602.8163.0723.328
Argentina2.5900.0002.5902.8493.1083.367
Mexico2.7500.0002.7503.0253.3003.575
Australia2.9700.0002.9703.2673.5643.861
Algeria3.0000.0003.0003.3003.6003.900
Uzbekistan3.2100.0003.2103.5313.8524.173
Russian Federation3.4300.0003.4303.7734.1164.459
China3.5650.0003.5653.9224.2784.635
South Africa4.1400.0004.1404.5544.9685.382
India4.3200.0004.3204.7525.1845.616
Kazakhstan5.2900.0005.2905.8196.3486.877
Indonesia8.2300.0008.2309.0539.87610.699

tCO₂e per tonne. Countries not listed use the value for other countries and territories. “Charged” is the total default, which for this good is direct emissions only, with the mark-up for the import year. Source: Implementing Regulation (EU) 2025/2621 as corrected by (EU) 2026/1740, Commission file version 2 (2026-08-06). Read how CBAM default values work and what CBAM costs, 2026 to 2034.