Your EU buyer asked for CBAM data: what to send, in what form, and by when

Updated 22 October 2026 · 8 min read · By the Tonnemark team

  • Since 1 January 2026 your EU buyer pays for the emissions in your goods, and can use your figures only if an accredited verifier has checked them.
  • Per installation and CN code they need your specific direct embedded emissions (indirect too for cement and fertilisers), your production route, the free-allocation figure and the verification report.
  • The first annual CBAM declaration, for 2026 imports, is due by 30 September 2027; certificates go on sale on 1 February 2027.
  • Importers bringing in 50 tonnes or less of CBAM goods a year are exempt, but most industrial buyers are far above that and need data for every tonne.
  • If you don’t answer, your goods are costed on default values plus a mark-up, which for many producers is far above their actual figure.

If you sell steel, aluminium, cement, fertilisers or hydrogen into the EU, your customers have probably sent you a CBAM questionnaire, an Excel template or a short email asking for “your CBAM data”. This guide explains what they actually need, why, and by when, so you can answer once, correctly, and keep the business.

Why your buyer is asking now

The CBAM definitive period started on 1 January 2026. Your buyer, as an authorised CBAM declarant, must declare the embedded emissions of everything they imported in 2026 and surrender one CBAM certificate per tonne of CO₂e, after deductions for EU free allocation and any carbon price you paid. The first declaration and surrender are due by 30 September 2027.

To declare actual emissions rather than defaults, your buyer needs figures from your installation, calculated with the EU method and verified by an accredited verifier. For goods imported in 2026, those figures must cover calendar year 2026. That is why the requests arrive now: the year is nearly over, and verification can only finish once it is.

Your buyer reports by installation and country of origin, keeps the supporting records for years after filing, and can be reviewed by their national authority and the Commission. So they need figures they can defend: tied to one named installation, one calendar year and one verification report. A sales email with a single company-wide number won’t do.

What your buyer needs from you

The content is set by Annex IV to Implementing Regulation (EU) 2025/2547, which defines the operator’s emissions report and its summary. Your buyer sees the summary. In practice it comes down to this:

Based on points 1.1, 1.2 and 2 of Annex IV to Implementing Regulation (EU) 2025/2547 and Article 9 of the CBAM Regulation.
ItemWhat to giveNote
OperatorLegal name, company registration number, full address in EnglishAs on your registration documents
InstallationName, UN/LOCODE, address and coordinates of the main emission sourcePlus your CBAM Registry installation ID, if registered
Processes and routesEach production process and route, e.g. EAF crude steel, hot rollingThe route decides your buyer’s benchmark
Specific direct embedded emissionstCO₂e per tonne, for each CN code you sellIncluding precursors
Specific indirect embedded emissionsOnly for cement, fertilisers and agglomerated iron oreNot for iron and steel, aluminium or hydrogen
Share of default valuesThe share of embedded emissions based on defaults, e.g. for bought-in precursorsRequired in the summary
Specific embedded free allocationPer good, with the CBAM benchmarks usedYour buyer’s deduction depends on it
Sector parametersSteel: reducing agent, Mn, Cr, Ni %, scrap per tonne, pre-consumer share. Cement: clinker ratio. Fertilisers: nitrogen contentReported in the buyer’s declaration
Reporting periodThe calendar year the data covers2026 for goods imported in 2026
VerificationThe verification report from an accredited verifier, with its accreditation numberUnverified data can’t be used
Carbon price paidAny carbon price effectively paid, net of rebates, with independent certificationOptional, lowers the bill

Two items surprise many producers. First, indirect emissions no longer count for steel and aluminium, so don’t let a buyer add your electricity to their chargeable figure. Second, the free-allocation figure is new: your buyer’s deduction is calculated from the benchmarks for your route and precursors, and the verifier confirms it. Our steel calculation guide shows how the emissions side is built.

The template: what format to send

In the transitional period, the Commission published an Excel communication template for installations, and many importers still send it out. For the definitive period, Article 10 of Regulation (EU) 2025/2547 makes the operator’s emissions report template mandatory, in English. Its content is in Annex IV. The Commission’s guidance for non-EU operators says an electronic template accompanies it.

You can share it in two ways. The Commission recommends registering your installation in the CBAM Registry, in the module for non-EU operators known as O3CI. You upload your data once and, after verification, share it with every declarant who imports your goods; they see a summary, not your full report. Registration is voluntary, at least for 2026. If you don’t register, you send the report yourself, and your buyers must request the complete emissions and verification reports so their authority can review them.

Whatever format your buyer asks for, the numbers must match your verified report exactly. Send one set of figures to everyone. If you run several plants, send one dataset per installation. Embedded emissions are determined per installation, each with its own emissions report and verification, so don’t average across sites.

You don’t have to hand over your whole cost structure. Through the registry, declarants see the summary. Shared directly, the full report shows your fuels, materials and production volumes, so consider a confidentiality agreement, and send each buyer only the goods that buyer imports.

Deadlines for 2026 imports

CBAM Regulation as amended by Regulation (EU) 2025/2083; Commission CBAM verification page and verification guidance of 24 August 2026.
DateWhat happens
1 January 2026Definitive period starts. Importers above the threshold need authorised CBAM declarant status
September 2026Accredited verifiers can register in the CBAM Registry and start verifications
January 2027Verifiers can issue the first reports on 2026 data
1 February 2027CBAM certificates go on sale on the common central platform
End of each quarter of 2027Your buyer must hold certificates for at least 50% of the embedded emissions imported so far that year
Mid-August 2027Latest date the Commission suggests for getting verified reports to declarants
30 September 2027Declaration for 2026 imports, and surrender of certificates, due
1 November 2027Unused certificates bought for 2026 emissions are cancelled

The 50-tonne threshold and why it matters

Regulation (EU) 2025/2083, the CBAM Omnibus, introduced a single mass-based threshold of 50 tonnes of net mass per importer per calendar year. An importer whose total imports of iron and steel, aluminium, cement and fertiliser goods stay at or below 50 tonnes is exempt from CBAM obligations. Hydrogen and electricity don’t benefit from it. The Commission reviews the threshold each year and can change it by delegated act, with effect from the next 1 January.

Why it matters to you:

  • It is per importer, across all suppliers. A buyer taking 30 tonnes from you and 30 from someone else is over the threshold.
  • Crossing it catches the whole year. Once over 50 tonnes, the importer owes CBAM on every tonne imported that calendar year, not just the excess.
  • Small buyers may stop asking. Distributors and workshops under 50 tonnes need no data. Industrial buyers, who are far above it, will keep asking every year.

What happens if you don’t answer

Your buyer still has to file. Without verified data they must use the EU default value for your country and CN code, increased by a mark-up of 10% in 2026, 20% in 2027 and 30% from 2028, or 1% for fertilisers. If your country has no value, they use the higher ‘Other countries and territories’ figure. Unverified numbers in an email don’t help: only verified actual emissions can replace defaults.

The difference can be large. For rebar from Türkiye in the third quarter of 2026, defaults cost the buyer about €99.69 a tonne in certificates. A scrap-based mill with verified data of 0.400 tCO₂e/t costs them about €24.53. That gap grows each year as the mark-up rises and free allocation falls. Run your own numbers in the CBAM calculator, and see the cost guide for the method.

Buyers will compare suppliers on this number. A supplier who costs them more in certificates will be asked for a lower price, or replaced.

If you buy precursors yourself

Your figure includes the embedded emissions of any CBAM goods you buy in: billets or slabs for a rolling mill, clinker for a grinding plant, ammonia for a fertiliser plant, primary ingot for an extruder. So your buyer’s request starts a chain. You need verified data from your own suppliers before your report can be finished, and they face the same timetable you do.

  • Ask your suppliers now, for the same items your buyer asks of you: installation, country, route, reporting period, specific embedded emissions and the verification report.
  • Where a supplier can’t deliver, you may use the EU default for their country for that precursor and actual data for your own processes. Your report then shows the share of emissions based on defaults.
  • If you can’t name the country of production, the highest default value of any country applies, so keep mill certificates and purchase records that show origin.
  • Precursors made in the EU count as zero, because they were already covered by the EU ETS.

How to answer well

  1. Confirm what you sell. List the installation and the 8-digit CN codes each buyer imports. Traders’ customers count too: if your goods end up in the EU, an importer will need your data.
  2. Write a monitoring plan in English and collect the 2026 data: fuels, materials, production, precursors and evidence.
  3. Calculate specific embedded emissions and free allocation per CN code with the EU method.
  4. Appoint an accredited verifier now. The first year needs a physical site visit and capacity is tight. See our verification guide.
  5. Consider registering in the CBAM Registry so you can share one verified dataset with all declarants.
  6. Send each buyer the same verified figures, with the reporting period and verifier details, and tell them when 2027 data will follow.

If verification won’t finish in time, say so early. Give your buyer an estimate for planning, clearly marked as unverified, so they can budget certificates. Without the verified report in time, they have to file those goods on defaults, so the earlier they know, the better they can plan. If you share through the CBAM Registry, ask each buyer for their EORI number: the Commission says declarants must give it to their suppliers outside the registry.

Tonnemark gives each buyer a private statement with your installation, coordinates, route, specific emissions per CN code and verifier, plus Excel and CSV downloads, and shows you when they opened it. Premium costs €490 per month, first month 30% off, or €4,900 per year, with unlimited installations, the metal passport and free setup. Start a 30-day free trial or book a 20-minute walkthrough.

Questions

What CBAM data does my EU buyer need from me?

Per installation and CN code: your specific direct embedded emissions in tCO₂e per tonne, indirect emissions too for cement and fertilisers, your production route, the specific embedded free allocation, the share based on default values, sector parameters, the reporting period, and the verification report from an accredited verifier. The content is set by Annex IV to Implementing Regulation (EU) 2025/2547.

When is the first CBAM declaration due?

The first annual CBAM declaration, covering goods imported in 2026, is due by 30 September 2027, together with the surrender of certificates. Certificates go on sale on 1 February 2027. The Commission suggests declarants receive verified data from producers by mid-August 2027, so producers should aim to finish verification of their 2026 data by early summer.

Do I have to give my buyer CBAM data?

The CBAM Regulation puts no direct obligation on a non-EU producer to hand over data, though your sales contract may. But if you don’t, your buyer must use default values with a mark-up, which usually costs them more in certificates. In practice, buyers treat verified CBAM data as part of the product, and they compare suppliers on the certificate cost per tonne.

Can I send unverified CBAM figures?

Your buyer can’t use them in the CBAM declaration. In the definitive period, actual emissions replace default values only if an accredited verifier has verified them with reasonable assurance. Unverified estimates can still help a buyer plan certificate purchases, but for the declaration they must either receive your verified report or fall back on default values with the mark-up.

What is the 50-tonne CBAM threshold?

Regulation (EU) 2025/2083 exempts importers whose total net mass of iron and steel, aluminium, cement and fertiliser goods stays at or below 50 tonnes in a calendar year. It counts all suppliers together. Once an importer exceeds it, CBAM applies to all their imports that year. It doesn’t apply to hydrogen or electricity, and the Commission reviews it annually.

Is there an official CBAM template for suppliers?

For the definitive period, Article 10 of Implementing Regulation (EU) 2025/2547 makes the operator’s emissions report template mandatory, with its content in Annex IV. Many importers still send the Excel communication template from the transitional period. The Commission recommends sharing data through the CBAM Registry’s module for non-EU operators, where declarants see a summary rather than your full report.